Showing posts with label Shawl. Show all posts
Showing posts with label Shawl. Show all posts

Friday, May 30, 2008

Are We Sick of the Icarus Yet?

I blocked the shawl yesterday when I got home from work before cooking dinner, bathing a cat, and running out to go to our class. In my excitement, I completely forgot to take a picture of it unblocked, and really wanted to take picture of it while it was soaking in the sink, but at the time Mr Kiwi and the camera were not home and it had to be done quickly so I could finish the remainder of the above list.

Since we have moved to a house with no carpet, I can't sit down and pin the shawl to the floor. That's what beds are for; beds with pillow top mattresses. I started to pin the length of the shawl with blocking pins, but after doing only half of it, I decided it was a stupid idea since it would be faster to just thread in the blocking wires, pin it in 4 places and then move on to pinning the peaks. I'd also avoid unwanted scallops on the straight edge this way as well. Unlike last time, once I got the wires in I only had to pin the shawl once since I followed the directions on binding off in the loose way they directed. I am pretty impressed with the size and am also glad that I spent a whole day ripping out those 14 rows since 1. I have a few yards of the ball left over, and 2. it seems to be the perfect size. Mr Kiwi was not exactly thrilled to come home from work to a frantic me with a wet shawl pinned across the bed, however when we got home from class at about 10:15pm he was a good sport and quickly hot some pictures before I ripped all the pins out and passed out on the bed.

Speaking of pictures....






This shawl was really pushing the deadline. I knew this was a busy month and that I would cut it close, but due to some unforeseen events it took about a week or two longer than I had anticipated. The point however is that I will be wearing it to the wedding tomorrow, and may get some good shots of it in action. I am very proud of this shawl, and am excited about getting to wear it out!

Tuesday, May 20, 2008

Icarus Update

And we've moved! We are now settling into our new house and are happily procrastinating unpacking all of the boxes. And we have had internet at the new place for about an hour and a half now. But this is not the point of the post.

This is an update on the Icarus that I am so trying to complete (less than two weeks!) for the wedding. I had previously thought that it wasn't going to be big enough and decided to add an extra repeat of Chart1 before doing the partial chart and diving into chart2. While I was working on the partial repeat AFTER completing the extra repeat of the chart, I decided that no, this was now going to be an Icarus blanket, not an Icarus shawl. And we don't want that. During the move, I managed to hurt my hips to the point where I could NOT remove myself from the couch without shrieking in agony (no lie) so I spent most of my time working on the shawl/blanket. It was during this time that I decided to rip back the 14 rows needed to undo the extra mess that I had created for myself.

Ripping lace is not entirely straight forward. If this was anything else, I would have slid the stitches off and started pulling, confident in my abilities to sort it out in a timely manner. The size lace weight yarn I am using and the Yo's next to ssk's and k2tog's made it so that I really didn't want to just rip and hope. Of course, being the cocky knitter I am, I had no lifeline. So what am I to do?

After doing one row, I decided that tinking was going to take waaay too long, and seeing as how I have a fast approaching deadline this was almost certainly not an option. I tried about 10 times to thread an afterthought lifeline, but alas the YO's, ssk's, and k2togs made it almost impossible to see if I was picking the right stitches. Solution? I decided that tinking back every 5 stitches out of 12 was better than tinking all those 12, so I thread a lifeline through the 7 plain knit stitches and skipped the pattern part. I dropped the knits and tinked back on the pattern, making sure not to drop anything vital. This ended up being much faster and successful than my alternative, and had I known in which box or bag the camera was in, I would have taken pictures of the before and after shots.

I am happy with the decision since I know the size will be what I want, but the only thing that makes me sad is the time that I spent doing all those extra rows and then having to undo them. I could have been getting it right the first time! Oh well. I am now almost finished with Chart2 (only 2 more rows left!) and will soon be moving on to Charts 3 and 4. I'm estimating that even if I power through I'll still be cutting it close and may finish May 30th. Today is the 20th after all... I only have 10 days left to work on it before having to wear it on the 11th day.

Tuesday, March 25, 2008

Dresses and Shawls

In continuation of my shawl and dress dilemma, I decided to stop off on the way home from work to a maternity outlet store. This store was really nice and big and had a huge selection of dresses! I was pleased that I actually had enough that looked decent and actually had to think about a few. I ended up unable to decide between two dresses, and since they weren't crazy expensive, I bought them both. That way I could show Mr Kiwi and get opinions, and take my time over thinking about them. I can also wear them a bunch of times and get good financial mileage out of them. Mr Kiwi prefers one over the other, so that will be the one I wear to the wedding, however I also have the bridal shower to go to where I could wear the other one. I am so NOT a dress person and usually go out of my way to get out of wearing one, but right now I am not so much a fan of pants. Or shorts. Or anything other than my underpants. So I may find myself in a comfy dress more than I'd have thought (Mr Kiwi was actually surprised to come home to find me with my pants still on since for the past few weeks, ripping them off is the first thing I do once getting in the door).
As if anyone really had to question, both dresses are predominantly purple. They are also highly patterned, so I don't feel I can used a variegated or bold yarn without it clashing with the dress. So because of the colors, I am down to the Misti Alpaca from two posts ago, as well as the Jojoland merino. I am still trying to decide if the Jojoland is too variegated. I might just stick with the Misti Alpaca since it it is solid and a safe bet. As for the pattern? I'm debating between the Icarus and Flower Basket shawls. Hmmm.

Friday, March 21, 2008

Decisions, decisions...

I finished the Double Wing Top on March 11th (and still have to get Mr Kiwi to take pictures..) and set on to a new, fast project; the pinwheel baby blanket. I had 5 skeins of a nice worsted weight wool and acrylic blend, and am almost finished with the blanket too!

I'm already plotting out my next project, and I am sure most of us knitters have found ourselves in a similar situation... I have a wedding to attend the last weekend in May, and am told that it may get a little chilly at the evening reception. New project: shawl! The problem? I don't have my outfit picked out yet, so picking the appropriate shawl and color is proving to be a bit difficult. So far I think I've convinced myself to either knit the Icarus Shawl or add some repeats to the Swallow Tail Shawl. I have plenty of time if I start next week, right? Since my yarn budget is quite tight right now I am trying to knit from my stash. My options are:
one skein of Claudia Hand Painted in the Blue Fields colorway.
2 skeins of Misti Alpaca Lace

2 skeins of Jojoland Harmony in the hc09 colorway
or 4 skeins of Crystal Palace Kid Merino.

(and yes, I realize how lame it is that I only have 1/2 the pictures)

So I have purples, a blue/yellow/green, and a cream/brown/white. I know that her bride's maids are going to be in moss green dresses with pink flowers. Seeing as how this is the first wedding I'm attending since being of the age of being forced into the flower girl role (oh, the scars! The memories!!) I don't know if I should match their colors or if I should wear whatever I happen to show up in. And should I plan the shawl and get the dress based on the shawl, or should I get the dress with these color combos in mind and then plan the shawl? Or should I just give up on knitting a shawl altogether and try to find a dress that matches the Famous Boise Shawl? All this, keeping in mind that a "simple dress" is not so easy for me to find since I am on a limited budget, and am restricted to maternity stores.

Maybe I should cut to the chase and go dress shopping this weekend and then look at my shawl making options. Hmm...